PERIOD CALCULATION OPTIMIZATION OF BOILER UNIT GROSS EFFICIENCY
https://doi.org/10.15518/isjaee.2016.05-06.008
Abstract
The paper describes the calculation of relative dynamic error of boiler gross efficiency at different signals averaging intervals and analyses actual values parameters signals mismatch of the power unit work. Moreover, it considers the possibility of improvement, both environmental and economic performance of plants by improving the accuracy and timeliness of entering of corrective actions in the operation of equipment of power generating units by optimizing the averaging period.
About the Authors
I. A. BoldyrevRussian Federation
Ph.D. (engineering), associate professor of the Workflow Automation department of National Research University MPEI branch in Volzhskiy. tel/fax: +7(8443)21-01-60
Education: National Research University Moscow Power Engineering Institute (2007).
Research area: automation and process control, alternative and renewable energy.
Y. A. Struzhinskaya
Russian Federation
assistant of the Workflow Automation department of National Research University MPEI branch in Volzhskiy. tel/fax: +7(8443)21-01-60
Education: National Research University Moscow Power Engineering Institute (2015).
Research area: automation and process control.
References
1. Ivanova G.M., Kuznetsov N.D., Chistyakov V.S. Teplotehničeskie izmereniâ i pribory. Moscow: Izdatel’stvo MÈI Publ., 2005 (in Russ.).
2. RD 34.09.453 Tipovoj algoritm rasčeta TÈP moŝnyh otopitel’nyh TÈC. Služba peredovogo opyta i informacii Soûztehènergo. Moscow, 1983 (in Russ.).
Review
For citations:
Boldyrev I.A., Struzhinskaya Y.A. PERIOD CALCULATION OPTIMIZATION OF BOILER UNIT GROSS EFFICIENCY. Alternative Energy and Ecology (ISJAEE). 2016;(5-6):76-79. (In Russ.) https://doi.org/10.15518/isjaee.2016.05-06.008